Header widget area left
Header widget area right
Construction

The BIM construction phase is scheduled through simulations that reproduce the construction process in time. We therefore have the opportunity to design variables site scenarios depending on the needs, plan construction sequences, perform assembly simulations and identify in advance the interference between systems and operations.

It’s possible to make a BIM construction site simulation in order to study in advance the organization of the working, work teams and the timing for the materials and equipment supply. Doing this you have the ability to solve all the founded problems and to prevent the construction site will present great problems of building feasibility. Through control tools you can manipulate special project elements (special facade panels) to optimize the fabrication and study their assembly methods.