01 · The project

The Napoli-Bari high-speed, high-capacity line includes two sections of 16 km each: Napoli-Cancello and Cancello-Frasso Telesino. The project is an important part of the European TEN-T programme for sustainable transport, which aims to move 50% of road freight to rail by 2050, triple the high-speed rail network, connect the main seaports to the railways and cut transport emissions by 60%.

The line will allow trains to run at 130 km/h through many inland areas, connecting communities and economies at risk of depopulation. Travel times will drop between Puglia and Campania, Lazio and the rest of central and northern Italy.

The expected benefits for the areas crossed by the line are significant: population growth of around 90,000 people, GDP growth of 1.6% and a 3.6% increase in residents' income.

02 · Scope

BIMON refined Pizzarotti's technical bid and introduced BIM as the methodology for designing and building the works. Adopting BIM design and BIM management from the tender stage made it possible to optimize the proposed improvements and to verify the real savings in cost and construction time.

BIMON built the digital model of the whole line, including all bridges, viaducts, underpasses and tunnels. The model was used for 4D and 5D simulations of the construction phases, for quantity extraction for the bill of quantities, for technical drawings and photorealistic images, and to study the critical issues of the final design. BIMON then developed the full detailed design of the tunnels.

03 · Results

01

Support in tender and detailed design

Introducing BIM from the bid stage made it possible to optimize the proposed improvements and verify the real savings in cost and construction time.

02

4D and 5D simulation

BIM supported 4D and 5D simulations of the construction phases, quantity extraction, technical drawings, photorealistic images and the study of critical issues in the final design.

04 · Gallery — Drag to explore

Watch in action

Road 222 and New Skurusund Bridge

Next project →

Road 222 and New Skurusund Bridge

Reach your digital future.

Tell us about your asset, your tender or your idea. A BIMON engineer will get back to you within two working days.