Skip to content
BIMON
Prato Hospital Digital Twin

Hospitals · Prato · 2022

Prato Hospital Digital Twin

For Impresa Pizzarotti, BIMON created the digital model of Prato Hospital and all its MEP systems, analysed the available data and connected the model to the hospital's management systems. The result is a Digital Twin built to reduce energy consumption and optimize maintenance.

Download the case study (PDF)
Client
Impresa Pizzarotti S.p.A.
Location
Prato, Italy
Year
2022
Area
60,000 m²
Status
Completed
Beds
540

01 · The project

The new Prato hospital is one of four large new hospitals in Tuscany, built with a project financing formula around efficiency, functionality, comfort and safety. It is part of the "Tuscan Hospitals" system built by Pizzarotti, which will also manage it for the next 25 years.

The complex sits north-west of the city, closely integrated with the surrounding area, and consists of two buildings: the hospital and the service building. It has 540 beds, 20 short intensive observation units, 40 dialysis stations, 15 operating rooms, 6 labour rooms and 4 delivery rooms.

The PNH Digital Twin project brings together data, software and algorithms to improve how the hospital is run, applying the Digital Twin and Smart Building concepts to energy consumption and maintenance.

02 · Scope

A working Digital Twin starts from a reliable digital representation of the building. BIMON built the BIM model of the hospital and of all its MEP systems, including every asset needed for operation, with accurate scanning and automated recognition and classification of components.

The model was then integrated with data from different sources, IoT sensors and the BMS, and piped into a digital data platform connected to the hospital's management system. BIMON analysed the available data and set up custom checks on information content, so that information and modelling nonconformities can be monitored over time.

With the data collected and analysed by Artificial Intelligence algorithms, the hospital can move to predictive maintenance and generate energy savings. Data is shown in simple, accessible dashboards for the people who run the building.

03 · Results

01

Digital Twin

A BIM model with all assets, integrated with IoT and BMS data on a single data platform, gives a live digital replica of the hospital.

02

Energy savings

Data collected and analysed with Artificial Intelligence algorithms enables predictive maintenance of the building and the resulting energy savings.

03

Asset digitalization

The hospital becomes a digital asset that is easy to manage, with better coordination among professionals and better planning of activities.

04 · Gallery — Drag to explore

Watch in action

Doha Metro Red Line North Underground

Next project →

Doha Metro Red Line North Underground

Reach your digital future.

Tell us about your asset, your tender or your idea. A BIMON engineer will get back to you within two working days.